- Client
- Ritz Carlton - Las Colinas
- General contractor
- Direct
- Project type
- Remodel
This complex fire protection electrical retrofit required fast-track engineering solutions to resolve severe code compliance and equipment sizing challenges under strict municipal oversight.
When an upgraded fire pump system required a motor sized 50 HP larger than the original equipment, existing conduit pathways were no longer sufficient. McGee Electrical Services engineered an approved solution using Mineral-Insulated (MI) fire-rated cable and installed a new NEMA-rated exterior disconnect to satisfy municipal code requirements.
Additionally, our team coordinated extensively with city inspectors to assist the facility through emergency power compliance, field UL evaluations, and final life-safety green-tag approval.
Job Features
- Engineered and installed high-capacity feeder solutions using Mineral-Insulated (MI) fire-rated cable.
- Upgraded electrical service feeders to support a 50 HP larger replacement fire pump motor.
- Installed exterior main disconnect equipment meeting strict municipal inspection standards.
- Navigated complex municipal code compliance and life-safety green-tag approval processes.
- Coordinated emergency generator power integration and field UL compliance evaluation.







